![]() ![]() We are able to cancel the material document if we use the transaction MIGO, however If we cancel the goods movement through other transactions / IDOC then the Function Module “BAPI_GOODSMVT_CANCEL’ is called and cancels the goods movement. When Sub-contracting PO scenario goods movement for material document cancelation in MIGO transaction (Manual process), it cancels the Material document and creates the new material document for 102 and 544. ![]() In this above business scenario goods movement cancellation through IDOC for 101 movement type along with 543 movement type, IDOC has been failed and status is 51 and the status message is “ PU WITHRAWN QTY EXCEEDED by 543 movement type line item Qty: WITH Material no Plant and Batch no”.īut same material document has successfully cancelled and it creates the new material document with movement type 102 and 544, during the manual process in MIGO transaction. Goods movement cancellation through IDOC or custom program for Subcontracting PO scenario (movement type 101 and 543 which is including component materials).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |